Charles is a clean tech recruiter working across Europe and the US, specializing in hard-to-fill roles within the energy transition. With a focus on emerging sectors like green hydrogen, energy storage, and grid infrastructure, Charles helps companies scale teams that will shape the future of energy.

Connect on LinkedIn or reach out to learn how your organization can overcome clean tech talent bottlenecks and build for long-term success.

In the race to decarbonize, Europe has made tremendous strides in scaling up renewable energy generation. From the wind-rich North Sea to the solar-saturated plains of southern Spain, gigawatts of clean electricity are being developed at an unprecedented rate. Yet one critical piece of the puzzle threatens to derail progress: the electricity grid.

While generation capacity is growing rapidly, the infrastructure needed to transmit and distribute this power is lagging behind. The result? Delays, bottlenecks, and stranded assets. And at the centre of this challenge lies a pressing issue that often goes unspoken: the growing shortage of talent with the expertise to solve it.

A Silent Crisis in Grid Infrastructure

Europe’s electricity grid was not designed for the clean energy transition. Built primarily to serve centralized fossil fuel power stations, it now needs to accommodate a growing number of decentralized, intermittent, and geographically diverse renewable sources. This shift requires a transformation of the grid itself: new transmission lines, smarter distribution networks, interconnectors between countries, and advanced digital infrastructure for real-time management.

However, many renewable projects are being held back by grid connection delays that last months, if not years. According to WindEurope, over 80 GW of wind energy projects are currently stuck in the grid connection queue across the continent. In Germany alone, the Bundesnetzagentur reported that the average time to secure a grid connection for large-scale renewables is now 24–36 months. The UK’s National Grid has revealed that some developers are facing potential connection dates as late as 2037.

Meanwhile, the European Network of Transmission System Operators for Electricity (ENTSO-E) has projected that Europe needs to invest at least €584 billion in grid infrastructure by 2030 to meet its climate and energy targets. Yet many of these investments are being slowed down by planning bottlenecks, permitting delays, and—critically—a lack of skilled personnel.

These are not just technical or regulatory problems—they’re also people problems.

The Talent Bottleneck

As a recruiter specializing in clean tech across Europe, I’ve seen firsthand the increasing demand for professionals in grid-related roles. These include grid planning engineers, transmission system analysts, interconnection specialists, and regulatory affairs experts. The reality is simple: the energy transition can’t happen without the people who make grid connections possible.

However, this talent pool is severely underdeveloped. Utilities and transmission system operators (TSOs) are struggling to fill roles, while developers often lack internal expertise to navigate complex interconnection processes. Engineering consultancies are swamped with work and can’t grow fast enough. And as digitalization becomes a bigger part of grid modernization, the need for data-savvy, tech-literate professionals is only increasing.

This shortage is compounded by competition from other industries. Many of the skills required—systems engineering, electrical design, regulatory knowledge—are also in demand in sectors like telecoms, transport, and data infrastructure. Without a coordinated push to grow and retain this workforce, grid development risks becoming the Achilles’ heel of Europe’s clean energy ambitions.

Implications for Developers and Investors

Grid-related delays aren’t just frustrating—they’re costly. Every month a project is held up due to interconnection issues, developers lose money and investors lose confidence. In some regions, projects are even being withdrawn because they cannot secure a viable grid connection within a reasonable timeframe.

This uncertainty can make or break a clean energy business case. It’s also having a knock-on effect on capital allocation, as financiers grow wary of projects with unresolved grid risks. For example, the UK’s Electricity System Operator (ESO) noted in 2023 that around 40% of projects in its interconnection queue might not proceed due to prolonged delays and cost uncertainties.

As the market grows more competitive, developers with in-house grid expertise—or trusted partnerships with recruitment firms who can find it—will gain a decisive edge.

The Regulatory Dimension

European regulators are beginning to take the issue seriously. Initiatives like the EU’s “Ten-Year Network Development Plan” (TYNDP) and the proposed Electricity Market Design reforms aim to streamline permitting and accelerate transmission upgrades. Cross-border coordination is also improving, particularly in the Nordics and Central Europe.

Yet regulatory progress alone won’t solve the problem if the talent isn’t there to implement it. Ambitious plans require a skilled workforce to make them real. That includes not just engineers and planners, but also project managers, legal experts, and stakeholder engagement professionals who can navigate the complexities of grid expansion.

What Needs to Happen Next

To address this talent gap and unlock Europe’s grid potential, several actions are needed:

  1. Education and training pathways: Universities, technical colleges, and vocational programs must create targeted courses focused on grid design, transmission systems, and energy market regulation. These programs should work in partnership with industry to ensure relevance.
  2. Reskilling and upskilling: Existing workers in adjacent fields—such as fossil power, industrial automation, or infrastructure—can be reskilled to fill grid-related roles. Government-backed training schemes can accelerate this transition.
  3. International mobility: Cross-border hiring must be made easier. Many European countries are facing the same grid challenges; sharing talent across markets can ease the burden and promote knowledge transfer.
  4. Strategic recruitment: Clean tech companies, utilities, and consultancies should work with recruitment partners who understand the nuances of grid roles and can tap into both active and passive talent pools.
  5. Employer branding and retention: Grid-related roles must be positioned as high-impact, future-facing careers. Companies that showcase their role in enabling the energy transition will attract more purpose-driven professionals.

A Call to Action for the Clean Tech Ecosystem

As a recruiter deeply embedded in Europe’s clean tech space, I believe we’re at a critical juncture. Solving the grid challenge is not optional—it’s fundamental. And that means investing in people, not just hardware.

If you’re a developer facing interconnection delays, ask whether you have the right in-house expertise—or recruitment strategy—to navigate the system. If you’re a policymaker, consider whether grid talent is factored into your infrastructure plans. And if you’re a professional looking to make a meaningful impact on the climate crisis, grid transformation could be the opportunity you’ve been waiting for.

The clean energy transition is about more than turbines and solar panels. It’s about systems. It’s about people. And it’s about building the invisible infrastructure that connects our ambitions to reality.

Speak to the team

Gibson Watts is a leadership recruitment and executive search company that is shaping a sustainable future for businesses and the planet.

To speak to someone, please feel free to contact us via the form or on:
(+44) 20 3880 0894